Bicycle Board Members,
FYI, I submitted the following (not on behalf of the BB but just myself):
Comments submitted to Greg Bailey, WVDOH January 24, 2012
I'm writing on the WV 705 Connector project as a Morgantown bicyclist and pedestrian. After having attended the January 24, 2012 public meeting at Easton Elementary School as well as previous meetings on this project, I offer the following recommendations.
- Install roundabout at Mileground/Airport Blvd. intersection. This roundabout will enable continuous flow on Mileground between and around the roundabouts.
2.Install mountable median instead of currently preferred center turn lane. Center turn lane (suicide lane) crash statistics prove that center turn lanes are extremely dangerous and unjustifiable in any modern design.
Post speed limit at 35 mph or less.
Install R4-11 Bicycles May Use Full Lane signs throughout the corridor.
Install sidewalk on the north side of Easton Hill to enable pedestrians from the West Run Valley to walk to Mileground.
Install sidewalk on east side of 705 between Mileground and Chestnut Ridge Rd. to enable pedestrians to walk between Mileground and Suncrest Town Center. (Rudimentary bicyclist and pedestrian connections between Suncrest Town Center and WVU Research Park, Monongalia General Hospital and businesses in Suncrest currently exist and justify pedestrian connection of Mileground to the Chestnut Ridge Rd. area.)
I appreciate your fair consideration of these recommendations.
Frank
Begin forwarded message:
From: Damien Davis ddavis@cityofmorgantown.org Date: January 25, 2012 8:46:15 AM EST To: William Wyant wwyant@hsc.wvu.edu, mmccabe@cityofmorgantown.org, wes@wnugent.com, Jeff Mikorski jmikorski@cityofmorgantown.org, j4im3s@gmail.com, "mckain, david" david.mckain@gmail.com, "Henry, Adam" Adam.Henry@mail.wvu.edu, christophergluck@gmail.com, psteel@access.k12.wv.us, "Gmeindl, Frank" frank.gmeindl@comcast.net, Andrea Soccorsi Andrea.Soccorsi@Mail.WVU.edu, Barbara Shellito bshellito@cityofmorgantown.org, Christiaan Abildso Christiaan.Abildso@mail.wvu.edu, Ken Martis kmartis@wvu.edu, Margaret Roberts Margaretormike@aol.com, Roy Nutter rnutter@wvu.edu, Trevor Lloyd tlloyd@cityofmorgantown.org Subject: WV 705 Connector (Mileground Widening Project) Reply-To: ddavis@cityofmorgantown.org
All,
Attached is the handout from DOH's public meeting concerning the 705 Connector project. At the back of the handout is a form for comments. Comments can also be made by visiting the link below:
http://www.transportation.wv.gov/highways/engineering/comment/wv705connector...
The DOH will be accepting comments until Friday, February 24, 2012.
J. Damien Davis, PE, CFM Assistant City Engineer City of Morgantown Public Works Department - Engineering Division 389 Spruce Street Morgantown, WV 26505 Office: 304.284.7398 Fax: 304.284.7409 www.morgantown.com
Frank,
Thank you for submitting your comments. In discussing the section of the Mileground from the intersection with WV 705 to Hartman Run DOH seemed to still be fairly flexible. Apparently they are doing additional operational analysis. I would encourage everyone to provide their input on the issue to DOH. You may submit comments online at the link below:
http://www.transportation.wv.gov/highways/engineering/comment/wv705connector /Pages/Comments.aspx
Thank you for your interest in transportation in our area.
Regards,
Bill Austin, AICP
Executive Director
Morgantown Monongalia MPO
82 Hart Field Road Ste. 105
Morgantown, WVA 26505
304-291-9571
304-692-7225 Mobile
"Things alter for the worse spontaneously, if they be not altered for the better designedly." ~Francis Bacon
"Faced with the choice between changing one's mind and proving that there is no need to do so, almost everyone gets busy on the proof." ~John Kenneth Galbraith
From: bikeboard-bounces@cheat.org [mailto:bikeboard-bounces@cheat.org] On Behalf Of Frank Gmeindl Sent: Wednesday, January 25, 2012 10:00 AM To: Bicycle Board Subject: [Bikeboard] Fwd: WV 705 Connector (Mileground Widening Project)
Bicycle Board Members,
FYI, I submitted the following (not on behalf of the BB but just myself):
Comments submitted to Greg Bailey, WVDOH January 24, 2012
I'm writing on the WV 705 Connector project as a Morgantown bicyclist and pedestrian. After having attended the January 24, 2012 public meeting at Easton Elementary School as well as previous meetings on this project, I offer the following recommendations.
1. Install roundabout at Mileground/Airport Blvd. intersection. This roundabout will enable continuous flow on Mileground between and around the roundabouts.
2.Install mountable median instead of currently preferred center turn lane. Center turn lane (suicide lane) crash statistics prove that center turn lanes are extremely dangerous and unjustifiable in any modern design.
3. Post speed limit at 35 mph or less.
4. Install R4-11 Bicycles May Use Full Lane signs throughout the corridor.
5. Install sidewalk on the north side of Easton Hill to enable pedestrians from the West Run Valley to walk to Mileground.
6. Install sidewalk on east side of 705 between Mileground and Chestnut Ridge Rd. to enable pedestrians to walk between Mileground and Suncrest Town Center. (Rudimentary bicyclist and pedestrian connections between Suncrest Town Center and WVU Research Park, Monongalia General Hospital and businesses in Suncrest currently exist and justify pedestrian connection of Mileground to the Chestnut Ridge Rd. area.)
I appreciate your fair consideration of these recommendations.
Frank
Begin forwarded message:
From: Damien Davis ddavis@cityofmorgantown.org
Date: January 25, 2012 8:46:15 AM EST
To: William Wyant wwyant@hsc.wvu.edu, mmccabe@cityofmorgantown.org, wes@wnugent.com, Jeff Mikorski jmikorski@cityofmorgantown.org, j4im3s@gmail.com, "mckain, david" david.mckain@gmail.com, "Henry, Adam" Adam.Henry@mail.wvu.edu, christophergluck@gmail.com, psteel@access.k12.wv.us, "Gmeindl, Frank" frank.gmeindl@comcast.net, Andrea Soccorsi Andrea.Soccorsi@Mail.WVU.edu, Barbara Shellito bshellito@cityofmorgantown.org, Christiaan Abildso Christiaan.Abildso@mail.wvu.edu, Ken Martis kmartis@wvu.edu, Margaret Roberts Margaretormike@aol.com, Roy Nutter rnutter@wvu.edu, Trevor Lloyd tlloyd@cityofmorgantown.org
Subject: WV 705 Connector (Mileground Widening Project)
Reply-To: ddavis@cityofmorgantown.org
All,
Attached is the handout from DOH's public meeting concerning the 705 Connector project. At the back of the handout is a form for comments. Comments can also be made by visiting the link below:
http://www.transportation.wv.gov/highways/engineering/comment/wv705connector /Pages/default.aspx
The DOH will be accepting comments until Friday, February 24, 2012.
J. Damien Davis, PE, CFM
Assistant City Engineer
City of Morgantown
Public Works Department - Engineering Division
389 Spruce Street
Morgantown, WV 26505
Office: 304.284.7398
Fax: 304.284.7409
www.morgantown.com
_____
No virus found in this message. Checked by AVG - www.avg.com Version: 10.0.1416 / Virus Database: 2109/4765 - Release Date: 01/25/12
Done. Thanks for the link Bill. Just needed a little nudge.
Chet
On Wed, Jan 25, 2012 at 10:41 AM, Bill Austin baustin@labyrinth.net wrote:
Frank,****
Thank you for submitting your comments. In discussing the section of the Mileground from the intersection with WV 705 to Hartman Run DOH seemed to still be fairly flexible. Apparently they are doing additional operational analysis. I would encourage everyone to provide their input on the issue to DOH. You may submit comments online at the link below:****
http://www.transportation.wv.gov/highways/engineering/comment/wv705connector...
Thank you for your interest in transportation in our area. ****
Regards,****
*Bill Austin, AICP*
*Executive Director*
*Morgantown Monongalia MPO*
82 Hart Field Road Ste. 105**
Morgantown, WVA 26505****
304-291-9571****
304-692-7225 Mobile****
"Things alter for the worse spontaneously, if they be not altered for the better designedly." ~Francis Bacon****
"Faced with the choice between changing one's mind and proving that there is no need to do so, almost everyone gets busy on the proof." ~John Kenneth Galbraith****
*From:* bikeboard-bounces@cheat.org [mailto:bikeboard-bounces@cheat.org] *On Behalf Of *Frank Gmeindl *Sent:* Wednesday, January 25, 2012 10:00 AM *To:* Bicycle Board *Subject:* [Bikeboard] Fwd: WV 705 Connector (Mileground Widening Project)
Bicycle Board Members,****
FYI, I submitted the following (not on behalf of the BB but just myself):*
Comments submitted to Greg Bailey, WVDOH January 24, 2012****
I'm writing on the WV 705 Connector project as a Morgantown bicyclist and pedestrian. After having attended the January 24, 2012 public meeting at Easton Elementary School as well as previous meetings on this project, I offer the following recommendations. ****
- Install roundabout at Mileground/Airport Blvd. intersection. This
roundabout will enable continuous flow on Mileground between and around the roundabouts. ****
2.Install mountable median instead of currently preferred center turn lane. Center turn lane (suicide lane) crash statistics prove that center turn lanes are extremely dangerous and unjustifiable in any modern design.
- Post speed limit at 35 mph or less.****
- Install R4-11 Bicycles May Use Full Lane signs throughout the corridor.
- Install sidewalk on the north side of Easton Hill to enable pedestrians
from the West Run Valley to walk to Mileground.****
- Install sidewalk on east side of 705 between Mileground and Chestnut
Ridge Rd. to enable pedestrians to walk between Mileground and Suncrest Town Center. (Rudimentary bicyclist and pedestrian connections between Suncrest Town Center and WVU Research Park, Monongalia General Hospital and businesses in Suncrest currently exist and justify pedestrian connection of Mileground to the Chestnut Ridge Rd. area.)****
I appreciate your fair consideration of these recommendations.****
Frank****
Begin forwarded message:****
*From: *Damien Davis ddavis@cityofmorgantown.org****
*Date: *January 25, 2012 8:46:15 AM EST****
*To: *William Wyant wwyant@hsc.wvu.edu, mmccabe@cityofmorgantown.org, wes@wnugent.com, Jeff Mikorski jmikorski@cityofmorgantown.org, j4im3s@gmail.com, "mckain, david" david.mckain@gmail.com, "Henry, Adam" Adam.Henry@mail.wvu.edu, christophergluck@gmail.com, psteel@access.k12.wv.us, "Gmeindl, Frank" frank.gmeindl@comcast.net, Andrea Soccorsi Andrea.Soccorsi@Mail.WVU.edu, Barbara Shellito < bshellito@cityofmorgantown.org>, Christiaan Abildso < Christiaan.Abildso@mail.wvu.edu>, Ken Martis kmartis@wvu.edu, Margaret Roberts Margaretormike@aol.com, Roy Nutter rnutter@wvu.edu, Trevor Lloyd tlloyd@cityofmorgantown.org****
*Subject: WV 705 Connector (Mileground Widening Project)*****
*Reply-To: *ddavis@cityofmorgantown.org****
All,
Attached is the handout from DOH's public meeting concerning the 705 Connector project. At the back of the handout is a form for comments. Comments can also be made by visiting the link below:
http://www.transportation.wv.gov/highways/engineering/comment/wv705connector...
The DOH will be accepting comments until Friday, February 24, 2012.
J. Damien Davis, PE, CFM*****
*Assistant City Engineer*****
City of Morgantown****
Public Works Department - Engineering Division****
389 Spruce Street****
Morgantown, WV 26505****
Office: 304.284.7398****
Fax: 304.284.7409****
www.morgantown.com****
No virus found in this message. Checked by AVG - www.avg.com Version: 10.0.1416 / Virus Database: 2109/4765 - Release Date: 01/25/12***
Bikeboard mailing list Bikeboard@cheat.org http://cheat.org/mailman/listinfo/bikeboard
Chet,
Thanks for the feedback. All, please feel free to share the link with your acquaintances.
Regards,
Bill Austin, AICP
Executive Director
Morgantown Monongalia MPO
82 Hart Field Road Ste. 105
Morgantown, WVA 26505
304-291-9571
304-692-7225 Mobile
"Things alter for the worse spontaneously, if they be not altered for the better designedly." ~Francis Bacon
"Faced with the choice between changing one's mind and proving that there is no need to do so, almost everyone gets busy on the proof." ~John Kenneth Galbraith
From: Chet Parsons [mailto:chetparsons@gmail.com] Sent: Wednesday, January 25, 2012 11:01 AM To: Bill Austin Cc: Frank Gmeindl; Bicycle Board Subject: Re: [Bikeboard] Fwd: WV 705 Connector (Mileground Widening Project)
Done. Thanks for the link Bill. Just needed a little nudge.
Chet
On Wed, Jan 25, 2012 at 10:41 AM, Bill Austin baustin@labyrinth.net wrote:
Frank,
Thank you for submitting your comments. In discussing the section of the Mileground from the intersection with WV 705 to Hartman Run DOH seemed to still be fairly flexible. Apparently they are doing additional operational analysis. I would encourage everyone to provide their input on the issue to DOH. You may submit comments online at the link below:
http://www.transportation.wv.gov/highways/engineering/comment/wv705connector /Pages/Comments.aspx
Thank you for your interest in transportation in our area.
Regards,
Bill Austin, AICP
Executive Director
Morgantown Monongalia MPO
82 Hart Field Road Ste. 105
Morgantown, WVA 26505
304-291-9571
304-692-7225 Mobile
"Things alter for the worse spontaneously, if they be not altered for the better designedly." ~Francis Bacon
"Faced with the choice between changing one's mind and proving that there is no need to do so, almost everyone gets busy on the proof." ~John Kenneth Galbraith
From: bikeboard-bounces@cheat.org [mailto:bikeboard-bounces@cheat.org] On Behalf Of Frank Gmeindl Sent: Wednesday, January 25, 2012 10:00 AM To: Bicycle Board Subject: [Bikeboard] Fwd: WV 705 Connector (Mileground Widening Project)
Bicycle Board Members,
FYI, I submitted the following (not on behalf of the BB but just myself):
Comments submitted to Greg Bailey, WVDOH January 24, 2012
I'm writing on the WV 705 Connector project as a Morgantown bicyclist and pedestrian. After having attended the January 24, 2012 public meeting at Easton Elementary School as well as previous meetings on this project, I offer the following recommendations.
1. Install roundabout at Mileground/Airport Blvd. intersection. This roundabout will enable continuous flow on Mileground between and around the roundabouts.
2.Install mountable median instead of currently preferred center turn lane. Center turn lane (suicide lane) crash statistics prove that center turn lanes are extremely dangerous and unjustifiable in any modern design.
3. Post speed limit at 35 mph or less.
4. Install R4-11 Bicycles May Use Full Lane signs throughout the corridor.
5. Install sidewalk on the north side of Easton Hill to enable pedestrians from the West Run Valley to walk to Mileground.
6. Install sidewalk on east side of 705 between Mileground and Chestnut Ridge Rd. to enable pedestrians to walk between Mileground and Suncrest Town Center. (Rudimentary bicyclist and pedestrian connections between Suncrest Town Center and WVU Research Park, Monongalia General Hospital and businesses in Suncrest currently exist and justify pedestrian connection of Mileground to the Chestnut Ridge Rd. area.)
I appreciate your fair consideration of these recommendations.
Frank
Begin forwarded message:
From: Damien Davis ddavis@cityofmorgantown.org
Date: January 25, 2012 8:46:15 AM EST
To: William Wyant wwyant@hsc.wvu.edu, mmccabe@cityofmorgantown.org, wes@wnugent.com, Jeff Mikorski jmikorski@cityofmorgantown.org, j4im3s@gmail.com, "mckain, david" david.mckain@gmail.com, "Henry, Adam" Adam.Henry@mail.wvu.edu, christophergluck@gmail.com, psteel@access.k12.wv.us, "Gmeindl, Frank" frank.gmeindl@comcast.net, Andrea Soccorsi Andrea.Soccorsi@Mail.WVU.edu, Barbara Shellito bshellito@cityofmorgantown.org, Christiaan Abildso Christiaan.Abildso@mail.wvu.edu, Ken Martis kmartis@wvu.edu, Margaret Roberts Margaretormike@aol.com, Roy Nutter rnutter@wvu.edu, Trevor Lloyd tlloyd@cityofmorgantown.org
Subject: WV 705 Connector (Mileground Widening Project)
Reply-To: ddavis@cityofmorgantown.org
All,
Attached is the handout from DOH's public meeting concerning the 705 Connector project. At the back of the handout is a form for comments. Comments can also be made by visiting the link below:
http://www.transportation.wv.gov/highways/engineering/comment/wv705connector /Pages/default.aspx
The DOH will be accepting comments until Friday, February 24, 2012.
J. Damien Davis, PE, CFM
Assistant City Engineer
City of Morgantown
Public Works Department - Engineering Division
389 Spruce Street
Morgantown, WV 26505
Office: 304.284.7398
Fax: 304.284.7409
www.morgantown.com
_____
No virus found in this message. Checked by AVG - www.avg.com Version: 10.0.1416 / Virus Database: 2109/4765 - Release Date: 01/25/12
_______________________________________________ Bikeboard mailing list Bikeboard@cheat.org http://cheat.org/mailman/listinfo/bikeboard
_____
No virus found in this message. Checked by AVG - www.avg.com Version: 10.0.1416 / Virus Database: 2109/4765 - Release Date: 01/25/12
Bicycle Board Members,
I'm thinking of submitting the following supplemental comment to WVDOH about Mileground. What do you think? Am I missing something that would make a 20 mph speed limit unrealistic given that the expected roundabout speed will be 20 mph? (I will submit this by Friday night if I don't hear from you. BTW, from discussions with other participants at the public meeting, I understand that WVDOH is very receptive to our comments so I would encourage you to comment. It's very easy on the on-line form at http://www.transportation.wv.gov/highways/engineering/comment/wv705connector...
Mr. Bailey,
This is a follow-up to the comments that I submitted January 24, 2012. My comment #3 was to post speed limit at 35 mph or less. At the public meeting January 25, a WVDOH engineer stated that the expected speed through the roundabouts is 20 mph. I would recommend then that the speed between the roundabouts and leading into the roundabouts be posted at 20 mph. I understand that one goal is to maximize throughput in the corridor and I suppose that having traffic flow continuously at 20 mph rather than speeding up and slowing down and sometimes even stopping would achieve that goal.
Again, sharing a bicyclist's perspective, when traffic is traveling at speeds similar to a bicyclist's speed, physical conflicts between motor vehicles and bicycles are minimized. At 20 mph along the level sections of the corridor, cyclists can "keep up with" traffic. Now, on Easton Hill coming from Pt. Marion Rd. to Mileground, cyclists are challenged to exceed 5 mph. Along this segment, it is critical that faster moving motor vehicles pass bicyclists safely. At least along this segment, Bicycles May Use Full Lane (R4-11) signs as described in the 2009 MUTCD can help ensure that bicyclists choose safe lane position and that motorists pass them safely. If WVDOH still hasn't adopted the 2009 MUTCD by the time the 705 connector project is built, Share the Road signs would be a minimal accommodation until WVDOH adopts the current MUTCD.
Frank
Begin forwarded message:
From: Frank Gmeindl frank.gmeindl@comcast.net Date: January 25, 2012 9:59:57 AM EST To: Bicycle Board bikeboard@cheat.org Subject: Fwd: WV 705 Connector (Mileground Widening Project)
Bicycle Board Members,
FYI, I submitted the following (not on behalf of the BB but just myself):
Comments submitted to Greg Bailey, WVDOH January 24, 2012
I'm writing on the WV 705 Connector project as a Morgantown bicyclist and pedestrian. After having attended the January 24, 2012 public meeting at Easton Elementary School as well as previous meetings on this project, I offer the following recommendations.
- Install roundabout at Mileground/Airport Blvd. intersection. This roundabout will enable continuous flow on Mileground between and around the roundabouts.
2.Install mountable median instead of currently preferred center turn lane. Center turn lane (suicide lane) crash statistics prove that center turn lanes are extremely dangerous and unjustifiable in any modern design.
Post speed limit at 35 mph or less.
Install R4-11 Bicycles May Use Full Lane signs throughout the corridor.
Install sidewalk on the north side of Easton Hill to enable pedestrians from the West Run Valley to walk to Mileground.
Install sidewalk on east side of 705 between Mileground and Chestnut Ridge Rd. to enable pedestrians to walk between Mileground and Suncrest Town Center. (Rudimentary bicyclist and pedestrian connections between Suncrest Town Center and WVU Research Park, Monongalia General Hospital and businesses in Suncrest currently exist and justify pedestrian connection of Mileground to the Chestnut Ridge Rd. area.)
I appreciate your fair consideration of these recommendations.
Frank
Begin forwarded message:
From: Damien Davis ddavis@cityofmorgantown.org Date: January 25, 2012 8:46:15 AM EST To: William Wyant wwyant@hsc.wvu.edu, mmccabe@cityofmorgantown.org, wes@wnugent.com, Jeff Mikorski jmikorski@cityofmorgantown.org, j4im3s@gmail.com, "mckain, david" david.mckain@gmail.com, "Henry, Adam" Adam.Henry@mail.wvu.edu, christophergluck@gmail.com, psteel@access.k12.wv.us, "Gmeindl, Frank" frank.gmeindl@comcast.net, Andrea Soccorsi Andrea.Soccorsi@Mail.WVU.edu, Barbara Shellito bshellito@cityofmorgantown.org, Christiaan Abildso Christiaan.Abildso@mail.wvu.edu, Ken Martis kmartis@wvu.edu, Margaret Roberts Margaretormike@aol.com, Roy Nutter rnutter@wvu.edu, Trevor Lloyd tlloyd@cityofmorgantown.org Subject: WV 705 Connector (Mileground Widening Project) Reply-To: ddavis@cityofmorgantown.org
All,
Attached is the handout from DOH's public meeting concerning the 705 Connector project. At the back of the handout is a form for comments. Comments can also be made by visiting the link below:
http://www.transportation.wv.gov/highways/engineering/comment/wv705connector...
The DOH will be accepting comments until Friday, February 24, 2012.
J. Damien Davis, PE, CFM Assistant City Engineer City of Morgantown Public Works Department - Engineering Division 389 Spruce Street Morgantown, WV 26505 Office: 304.284.7398 Fax: 304.284.7409 www.morgantown.com
I agree. I asked the same question when I was at the meeting, shouldn't the speed of the road be the same as the roundabout to maintain a continuous flow of traffic? We need to emphasis "Complete Streets." We can make it happen!
Also, the 2009 MUTCD has shared lane markings (Section 9C.07), another great facility to include in comments.
Since Christiaan is cced to this conversation, I want to add that when I spoke to Jason Foster, design section head, about sidewalks in Phase I (Stewartstown Intersection to Mileground Intersection) , he said WVDOH is still determining the viability of them, and that they don't want to build sidewalks to nowhere. Right now, at best, they are considering sidewalks only on one side. I would comment that sidewalks be built on both sides as Jan Derry, director of NWV Center of Independent Living discusses in the Dominion Post (Jan. 25).
You can watch me talking to Jason here: http://www.wboy.com/video?clipId=6671925&autostart=true http://www.wboy.com/video?clipId=6671925&autostart=true
-Jonathan
On 1/26/2012 2:27 PM, Frank Gmeindl wrote:
Bicycle Board Members,
I'm thinking of submitting the following supplemental comment to WVDOH about Mileground. What do you think? Am I missing something that would make a 20 mph speed limit unrealistic given that the expected roundabout speed will be 20 mph? (I will submit this by Friday night if I don't hear from you. BTW, from discussions with other participants at the public meeting, I understand that WVDOH is very receptive to our comments so I would encourage you to comment. It's very easy on the on-line form at http://www.transportation.wv.gov/highways/engineering/comment/wv705connector...
Mr. Bailey,
This is a follow-up to the comments that I submitted January 24, 2012. My comment #3 was to post speed limit at 35 mph or less. At the public meeting January 25, a WVDOH engineer stated that the expected speed through the roundabouts is 20 mph. I would recommend then that the speed between the roundabouts and leading into the roundabouts be posted at 20 mph. I understand that one goal is to maximize throughput in the corridor and I suppose that having traffic flow continuously at 20 mph rather than speeding up and slowing down and sometimes even stopping would achieve that goal.
Again, sharing a bicyclist's perspective, when traffic is traveling at speeds similar to a bicyclist's speed, physical conflicts between motor vehicles and bicycles are minimized. At 20 mph along the level sections of the corridor, cyclists can "keep up with" traffic. Now, on Easton Hill coming from Pt. Marion Rd. to Mileground, cyclists are challenged to exceed 5 mph. Along this segment, it is critical that faster moving motor vehicles pass bicyclists safely. At least along this segment, Bicycles May Use Full Lane (R4-11) signs as described in the 2009 MUTCD can help ensure that bicyclists choose safe lane position and that motorists pass them safely. If WVDOH still hasn't adopted the 2009 MUTCD by the time the 705 connector project is built, Share the Road signs would be a minimal accommodation until WVDOH adopts the current MUTCD.
Frank
Begin forwarded message:
*From: *Frank Gmeindl <frank.gmeindl@comcast.net mailto:frank.gmeindl@comcast.net> *Date: *January 25, 2012 9:59:57 AM EST *To: *Bicycle Board <bikeboard@cheat.org mailto:bikeboard@cheat.org> *Subject: **Fwd: WV 705 Connector (Mileground Widening Project)*
Bicycle Board Members,
FYI, I submitted the following (not on behalf of the BB but just myself):
Comments submitted to Greg Bailey, WVDOH January 24, 2012
I'm writing on the WV 705 Connector project as a Morgantown bicyclist and pedestrian. After having attended the January 24, 2012 public meeting at Easton Elementary School as well as previous meetings on this project, I offer the following recommendations.
- Install roundabout at Mileground/Airport Blvd. intersection.
This roundabout will enable continuous flow on Mileground between and around the roundabouts.
2.Install mountable median instead of currently preferred center turn lane. Center turn lane (suicide lane) crash statistics prove that center turn lanes are extremely dangerous and unjustifiable in any modern design.
Post speed limit at 35 mph or less.
Install R4-11 Bicycles May Use Full Lane signs throughout the
corridor.
- Install sidewalk on the north side of Easton Hill to enable
pedestrians from the West Run Valley to walk to Mileground.
- Install sidewalk on east side of 705 between Mileground and
Chestnut Ridge Rd. to enable pedestrians to walk between Mileground and Suncrest Town Center. (Rudimentary bicyclist and pedestrian connections between Suncrest Town Center and WVU Research Park, Monongalia General Hospital and businesses in Suncrest currently exist and justify pedestrian connection of Mileground to the Chestnut Ridge Rd. area.)
I appreciate your fair consideration of these recommendations.
Frank
Begin forwarded message:
*From: *Damien Davis <ddavis@cityofmorgantown.org mailto:ddavis@cityofmorgantown.org> *Date: *January 25, 2012 8:46:15 AM EST *To: *William Wyant <wwyant@hsc.wvu.edu mailto:wwyant@hsc.wvu.edu>, mmccabe@cityofmorgantown.org mailto:mmccabe@cityofmorgantown.org, wes@wnugent.com mailto:wes@wnugent.com, Jeff Mikorski <jmikorski@cityofmorgantown.org mailto:jmikorski@cityofmorgantown.org>, j4im3s@gmail.com mailto:j4im3s@gmail.com, "mckain, david" <david.mckain@gmail.com mailto:david.mckain@gmail.com>, "Henry, Adam" <Adam.Henry@mail.wvu.edu mailto:Adam.Henry@mail.wvu.edu>, christophergluck@gmail.com mailto:christophergluck@gmail.com, psteel@access.k12.wv.us mailto:psteel@access.k12.wv.us, "Gmeindl, Frank" <frank.gmeindl@comcast.net mailto:frank.gmeindl@comcast.net>, Andrea Soccorsi <Andrea.Soccorsi@Mail.WVU.edu mailto:Andrea.Soccorsi@Mail.WVU.edu>, Barbara Shellito <bshellito@cityofmorgantown.org mailto:bshellito@cityofmorgantown.org>, Christiaan Abildso <Christiaan.Abildso@mail.wvu.edu mailto:Christiaan.Abildso@mail.wvu.edu>, Ken Martis <kmartis@wvu.edu mailto:kmartis@wvu.edu>, Margaret Roberts <Margaretormike@aol.com mailto:Margaretormike@aol.com>, Roy Nutter <rnutter@wvu.edu mailto:rnutter@wvu.edu>, Trevor Lloyd <tlloyd@cityofmorgantown.org mailto:tlloyd@cityofmorgantown.org> *Subject: **WV 705 Connector (Mileground Widening Project)* *Reply-To: *ddavis@cityofmorgantown.org mailto:ddavis@cityofmorgantown.org
All,
Attached is the handout from DOH's public meeting concerning the 705 Connector project. At the back of the handout is a form for comments. Comments can also be made by visiting the link below:
http://www.transportation.wv.gov/highways/engineering/comment/wv705connector...
The DOH will be accepting comments until Friday, February 24, 2012.
J. Damien Davis, PE, CFM* *Assistant****City**Engineer* **City ofMorgantown Public Works Department - Engineering Division 389 Spruce Street Morgantown,WV26505 Office: 304.284.7398 Fax: 304.284.7409 www.morgantown.com http://www.morgantown.com/
=
Bikeboard mailing list Bikeboard@cheat.org http://cheat.org/mailman/listinfo/bikeboard
On Jan 26, 2012, at 2:48 PM, Jonathan Rosenbaum wrote:
I agree. I asked the same question when I was at the meeting, shouldn't the speed of the road be the same as the roundabout to maintain a continuous flow of traffic? We need to emphasis "Complete Streets." We can make it happen!
Also, the 2009 MUTCD has shared lane markings (Section 9C.07), another great facility to include in comments.
One problem with shared lane markings on 4-lane roads is which lanes to put them in. If you just put them in the right lane, they could lead motorists to expect cyclists to stay in the right lane and could discourage cyclists from changing lanes before making a left turn. One beauty of Bicycles May Use Full Lane (R4-11) signs is that they apply to whatever lane the cyclist is in. I would expect WVDOH to highly resist putting shared lane markings in all lanes on the basis of marking clutter.
Since Christiaan is cced to this conversation, I want to add that when I spoke to Jason Foster, design section head, about sidewalks in Phase I (Stewartstown Intersection to Mileground Intersection) , he said WVDOH is still determining the viability of them, and that they don't want to build sidewalks to nowhere. Right now, at best, they are considering sidewalks only on one side. I would comment that sidewalks be built on both sides as Jan Derry, director of NWV Center of Independent Living discusses in the Dominion Post (Jan. 25).
You can watch me talking to Jason here: http://www.wboy.com/video?clipId=6671925&autostart=true
-Jonathan
On 1/26/2012 2:27 PM, Frank Gmeindl wrote:
Bicycle Board Members,
I'm thinking of submitting the following supplemental comment to WVDOH about Mileground. What do you think? Am I missing something that would make a 20 mph speed limit unrealistic given that the expected roundabout speed will be 20 mph? (I will submit this by Friday night if I don't hear from you. BTW, from discussions with other participants at the public meeting, I understand that WVDOH is very receptive to our comments so I would encourage you to comment. It's very easy on the on-line form at http://www.transportation.wv.gov/highways/engineering/comment/wv705connector...
Mr. Bailey,
This is a follow-up to the comments that I submitted January 24, 2012. My comment #3 was to post speed limit at 35 mph or less. At the public meeting January 25, a WVDOH engineer stated that the expected speed through the roundabouts is 20 mph. I would recommend then that the speed between the roundabouts and leading into the roundabouts be posted at 20 mph. I understand that one goal is to maximize throughput in the corridor and I suppose that having traffic flow continuously at 20 mph rather than speeding up and slowing down and sometimes even stopping would achieve that goal.
Again, sharing a bicyclist's perspective, when traffic is traveling at speeds similar to a bicyclist's speed, physical conflicts between motor vehicles and bicycles are minimized. At 20 mph along the level sections of the corridor, cyclists can "keep up with" traffic. Now, on Easton Hill coming from Pt. Marion Rd. to Mileground, cyclists are challenged to exceed 5 mph. Along this segment, it is critical that faster moving motor vehicles pass bicyclists safely. At least along this segment, Bicycles May Use Full Lane (R4-11) signs as described in the 2009 MUTCD can help ensure that bicyclists choose safe lane position and that motorists pass them safely. If WVDOH still hasn't adopted the 2009 MUTCD by the time the 705 connector project is built, Share the Road signs would be a minimal accommodation until WVDOH adopts the current MUTCD.
Frank
Begin forwarded message:
From: Frank Gmeindl frank.gmeindl@comcast.net Date: January 25, 2012 9:59:57 AM EST To: Bicycle Board bikeboard@cheat.org Subject: Fwd: WV 705 Connector (Mileground Widening Project)
Bicycle Board Members,
FYI, I submitted the following (not on behalf of the BB but just myself):
Comments submitted to Greg Bailey, WVDOH January 24, 2012
I'm writing on the WV 705 Connector project as a Morgantown bicyclist and pedestrian. After having attended the January 24, 2012 public meeting at Easton Elementary School as well as previous meetings on this project, I offer the following recommendations.
- Install roundabout at Mileground/Airport Blvd. intersection. This roundabout will enable continuous flow on Mileground between and around the roundabouts.
2.Install mountable median instead of currently preferred center turn lane. Center turn lane (suicide lane) crash statistics prove that center turn lanes are extremely dangerous and unjustifiable in any modern design.
Post speed limit at 35 mph or less.
Install R4-11 Bicycles May Use Full Lane signs throughout the corridor.
Install sidewalk on the north side of Easton Hill to enable pedestrians from the West Run Valley to walk to Mileground.
Install sidewalk on east side of 705 between Mileground and Chestnut Ridge Rd. to enable pedestrians to walk between Mileground and Suncrest Town Center. (Rudimentary bicyclist and pedestrian connections between Suncrest Town Center and WVU Research Park, Monongalia General Hospital and businesses in Suncrest currently exist and justify pedestrian connection of Mileground to the Chestnut Ridge Rd. area.)
I appreciate your fair consideration of these recommendations.
Frank
Begin forwarded message:
From: Damien Davis ddavis@cityofmorgantown.org Date: January 25, 2012 8:46:15 AM EST To: William Wyant wwyant@hsc.wvu.edu, mmccabe@cityofmorgantown.org, wes@wnugent.com, Jeff Mikorski jmikorski@cityofmorgantown.org, j4im3s@gmail.com, "mckain, david" david.mckain@gmail.com, "Henry, Adam" Adam.Henry@mail.wvu.edu, christophergluck@gmail.com, psteel@access.k12.wv.us, "Gmeindl, Frank" frank.gmeindl@comcast.net, Andrea Soccorsi Andrea.Soccorsi@Mail.WVU.edu, Barbara Shellito bshellito@cityofmorgantown.org, Christiaan Abildso Christiaan.Abildso@mail.wvu.edu, Ken Martis kmartis@wvu.edu, Margaret Roberts Margaretormike@aol.com, Roy Nutter rnutter@wvu.edu, Trevor Lloyd tlloyd@cityofmorgantown.org Subject: WV 705 Connector (Mileground Widening Project) Reply-To: ddavis@cityofmorgantown.org
All,
Attached is the handout from DOH's public meeting concerning the 705 Connector project. At the back of the handout is a form for comments. Comments can also be made by visiting the link below:
http://www.transportation.wv.gov/highways/engineering/comment/wv705connector...
The DOH will be accepting comments until Friday, February 24, 2012.
J. Damien Davis, PE, CFM Assistant City Engineer City of Morgantown Public Works Department - Engineering Division 389 Spruce Street Morgantown, WV 26505 Office: 304.284.7398 Fax: 304.284.7409 www.morgantown.com
=
Bikeboard mailing list Bikeboard@cheat.org http://cheat.org/mailman/listinfo/bikeboard
Thanks Jonathan. I will be submitting comments to provide sidewalks on both sides the length of the project, and make it a 4-lane with two roundabouts with reduced lane widths and speed limits and at least one ped-activated crossing along the Mileground.
Interestingly, after a recent snow I saw footprints in the snow on the shoulder the entire length of 705 from Don Nehlen/Sheetz up to the Mileground. PROOF, peds use it!
Key to my argument are the data from the models and the conclusion made by the DOT's consultant (Entran) in its report about the Mileground, (page 27, see http://plantogether.org/documents/plan/MilegroundRoadReport.pdf) "The Four-Lane alternative with roundabouts at major intersection would add capacity and reduce congestion. The raised median would eliminate left turns and make all driveways right-in/right-out access points; left turns would be accommodated as U-turns through the downstream roundabout. This alternative offers improved safety compared to the existing three-lane cross-section and there would be smoother flow along Mileground Road, but there could be an associated negative perception by local businesses and patrons because of the elimination of left turns. For this alternative, a roundabout at Mileground Road/Cheat Road/Point Marion Road is not recommended due to safety concerns associated with approach grades that are steeper than recommended guidelines. Finally, the Four-Lane alternative would have significant right-of-way acquisition requirements.
The Five-Lane alternative also performed well with respect to reducing congestion, but right-of-way acquisition would be most significant among the options that were considered. Additionally, vehicular conflicts and resulting crashes would be expected to increase when compared to the existing three-lane section and as traffic volumes grow."
Please share the above with the BB. Christiaan
On 1/26/2012 at 2:48 PM, freesource@cheat.org wrote:
I agree. I asked the same question when I was at the meeting, shouldn't the speed of the road be the same as the roundabout to maintain a continuous flow of traffic? We need to emphasis "Complete Streets." We can make it happen!
Also, the 2009 MUTCD has shared lane markings (Section 9C.07), another great facility to include in comments.
Since Christiaan is cced to this conversation, I want to add that when I spoke to Jason Foster, design section head, about sidewalks in Phase I (Stewartstown Intersection to Mileground Intersection) , he said WVDOH is still determining the viability of them, and that they don't want to build sidewalks to nowhere. Right now, at best, they are considering sidewalks only on one side. I would comment that sidewalks be built on both sides as Jan Derry, director of NWV Center of Independent Living discusses in the Dominion Post (Jan. 25).
You can watch me talking to Jason here: http://www.wboy.com/video?clipId=6671925&autostart=true
-Jonathan
On 1/26/2012 2:27 PM, Frank Gmeindl wrote:
Bicycle Board Members,
I'm thinking of submitting the following supplemental comment to WVDOH about Mileground. What do you think? Am I missing something that would make a 20 mph speed limit unrealistic given that the expected roundabout speed will be 20 mph? (I will submit this by Friday night if I don't hear from you. BTW, from discussions with other participants at the public meeting, I understand that WVDOH is very receptive to our comments so I would encourage you to comment. It's very easy on the on-line form at http://www.transportation.wv.gov/highways/engineering/comment/wv705connector...
Mr. Bailey,
This is a follow-up to the comments that I submitted January 24, 2012. My comment #3 was to post speed limit at 35 mph or less. At the public meeting January 25, a WVDOH engineer stated that the expected speed through the roundabouts is 20 mph. I would recommend then that the speed between the roundabouts and leading into the roundabouts be posted at 20 mph. I understand that one goal is to maximize throughput in the corridor and I suppose that having traffic flow continuously at 20 mph rather than speeding up and slowing down and sometimes even stopping would achieve that goal.
Again, sharing a bicyclist's perspective, when traffic is traveling at speeds similar to a bicyclist's speed, physical conflicts between motor vehicles and bicycles are minimized. At 20 mph along the level sections of the corridor, cyclists can "keep up with" traffic. Now, on Easton Hill coming from Pt. Marion Rd. to Mileground, cyclists are challenged to exceed 5 mph. Along this segment, it is critical that faster moving motor vehicles pass bicyclists safely. At least along this segment, Bicycles May Use Full Lane (R4-11) signs as described in the 2009 MUTCD can help ensure that bicyclists choose safe lane position and that motorists pass them safely. If WVDOH still hasn't adopted the 2009 MUTCD by the time the 705 connector project is built, Share the Road signs would be a minimal accommodation until WVDOH adopts the current MUTCD.
Frank
Begin forwarded message:
From: Frank Gmeindl frank.gmeindl@comcast.net Date: January 25, 2012 9:59:57 AM EST To: Bicycle Board bikeboard@cheat.org Subject: Fwd: WV 705 Connector (Mileground Widening Project)
Bicycle Board Members,
FYI, I submitted the following (not on behalf of the BB but just myself):
Comments submitted to Greg Bailey, WVDOH January 24, 2012
I'm writing on the WV 705 Connector project as a Morgantown bicyclist and pedestrian. After having attended the January 24, 2012 public meeting at Easton Elementary School as well as previous meetings on this project, I offer the following recommendations.
1. Install roundabout at Mileground/Airport Blvd. intersection. This roundabout will enable continuous flow on Mileground between and around the roundabouts.
2.Install mountable median instead of currently preferred center turn lane. Center turn lane (suicide lane) crash statistics prove that center turn lanes are extremely dangerous and unjustifiable in any modern design.
3. Post speed limit at 35 mph or less.
4. Install R4-11 Bicycles May Use Full Lane signs throughout the corridor.
5. Install sidewalk on the north side of Easton Hill to enable pedestrians from the West Run Valley to walk to Mileground.
6. Install sidewalk on east side of 705 between Mileground and Chestnut Ridge Rd. to enable pedestrians to walk between Mileground and Suncrest Town Center. (Rudimentary bicyclist and pedestrian connections between Suncrest Town Center and WVU Research Park, Monongalia General Hospital and businesses in Suncrest currently exist and justify pedestrian connection of Mileground to the Chestnut Ridge Rd. area.)
I appreciate your fair consideration of these recommendations.
Frank
Begin forwarded message:
From: Damien Davis ddavis@cityofmorgantown.org Date: January 25, 2012 8:46:15 AM EST To: William Wyant wwyant@hsc.wvu.edu, mmccabe@cityofmorgantown.org, wes@wnugent.com, Jeff Mikorski jmikorski@cityofmorgantown.org, j4im3s@gmail.com, "mckain, david" david.mckain@gmail.com, "Henry, Adam" Adam.Henry@mail.wvu.edu, christophergluck@gmail.com, psteel@access.k12.wv.us, "Gmeindl, Frank" frank.gmeindl@comcast.net, Andrea Soccorsi Andrea.Soccorsi@Mail.WVU.edu, Barbara Shellito bshellito@cityofmorgantown.org, Christiaan Abildso Christiaan.Abildso@mail.wvu.edu, Ken Martis kmartis@wvu.edu, Margaret Roberts Margaretormike@aol.com, Roy Nutter rnutter@wvu.edu, Trevor Lloyd tlloyd@cityofmorgantown.org Subject: WV 705 Connector (Mileground Widening Project) Reply-To: ddavis@cityofmorgantown.org
All,
Attached is the handout from DOH's public meeting concerning the 705 Connector project. At the back of the handout is a form for comments. Comments can also be made by visiting the link below:
http://www.transportation.wv.gov/highways/engineering/comment/wv705connector...
The DOH will be accepting comments until Friday, February 24, 2012.
J. Damien Davis, PE, CFM Assistant City Engineer City of Morgantown Public Works Department - Engineering Division 389 Spruce Street Morgantown, WV 26505 Office: 304.284.7398 Fax: 304.284.7409 www.morgantown.com
=
_______________________________________________ Bikeboard mailing listBikeboard@cheat.orghttp://cheat.org/mailman/listinfo/bikeboard